EDGPA performed the following for the plant header replacement:
- Replacement of the inlet / outlet headers to 11 heaters in Onshore treating system
- Includes 24”, 18” and 12” header piping and 22 – 12” downcommers to heaters
- Concrete foundations for new pipe rack
- Structural steel design for new pipe rack
- Significant challenge to locate new rack and piping adjacent to existing heaters