EDG, Inc. performed an alternative analysis (pre-FEED), FEED, and follow-on engineering for Offshore Gas Development.
EDG, Inc. performed an alternative analysis (pre-FEED), FEED, and follow-on engineering for Offshore Gas Development.
This included a 22,000-short-ton Central Processing Platform, 200-man bridge-connected Living Quarters, bridge-connected flare, multiple Wellhead Platforms, infield pipelines, and an FSO for condensate storage.
The development was approximately 300 km. from shore in a water depth of approximately 250 ft. It was connected to multiple power generation facilities onshore by a 450 km., 28” pipeline. The massive gas processing and compression deck was installed using floatover technology.