EDG, Inc. was responsible for Well Sites and Gas Conditioning/Condensate stabilization plant for Eagle Ford Shale & Utica Gas/Liquids.
The scope of this project included the development of design basis for standardized well-site and the complete detailed engineering design for well-site. The project entailed equipment specifications and skid design, PSM tasks related to HAZOP facilitation, engineering evaluation/recommendations, facility layouts and P&IDs, as well as design, drafting, and streamlined project controls.