EDG, Inc. was retained by Client to provide design and project management and procurement services to modify their existing dry cement terminal by creating a new cement loadout lane and to modify it to be a Self–Service Loading System (SSL) to operate 24 hours a day. Specifically, the project added a new loadout spout and positioner, truck scale, modification of existing air gravity conveyor system, dust filter and hatch stations. It also included a new entrance portal.
EDG performed mechanical, structural, electrical design services, and project management services.
![](https://www.edg.net/wp-content/uploads/2019/04/Dry-Cement-Plant-Upgrade-800x500.png)
![](https://www.edg.net/wp-content/uploads/2019/04/Dry-Cement-Plant-Upgrade-800x500.png)
![](https://www.edg.net/wp-content/uploads/2019/04/Dry-Cement-Plant-Upgrade-3-799x500.png)
![](https://www.edg.net/wp-content/uploads/2019/04/Dry-Cement-Plant-Upgrade-3-799x500.png)
![](https://www.edg.net/wp-content/uploads/2019/04/Dry-Cement-Plant-Upgrade-2.png-e1555108116397-576x500.jpg)
![](https://www.edg.net/wp-content/uploads/2019/04/Dry-Cement-Plant-Upgrade-2.png-e1555108116397-576x500.jpg)