Mafumeira Norte

Client | CABGOC // Location | Angola Africa

The Mafumeira Norte is a new 20 slot, 40,000 bopd wellhead platform located in 200-ft of water in offshore Angola.

The new Mafumeira Norte platform consists of production / test manifolds, power generation, MCC Building, multi- phase meters, pig traps, all required utilities (crane, diesel handling, chemical injection, instrument air, water treating).

Execution

Commingled well production from the new production platform flows directly to the existing KWIP platform via a 12” multiphase pipeline. A major upgrade of the existing KWIP platform was also performed including production separation upgrades, additional pig traps, new anti-slug mitigation, increased power generation, additional of new crude oil pumps, new turbine driven water injection pumps, and modifications to platform utilities.

EDG performed detailed engineering, drafting, procurement, KWIP Brownfield execution planning, construction support and on-site supervision for both New platform and Brownfield Upgrades. EDG spent over 200,000 man-hours. Start of detailed engineering to platform ready for first oil was achieved in 24 months.


< View All Projects

< View Upstream

{snippet:global_analytics}