The Project Scope included the addition of the below equipment and associated major platform modifications:

  • Addition of 2250 BHP, 3-stage Compressor Unit
  • Addition of a new L.P. Production Separator
  • Addition of a new set of Charge and Pipeline Pumps
  • Addition of a 15 ft. x 50 ft. Deck Extension
  • Platform Vibration Analyses to accommodate new compressor addition
  • Four (4) Well Conductor additions with associated structural and piping modifications
  • 100 kip stacked separator skid re-location engineering
  • Elevation of Helideck due to height restrictions
  • Relief Boom modification due to compressor addition
  • MCC & Switchgear Additions
  • BSEE Structural and Facility Permitting
  • Construction and installation support

Low Pressure System Addition construction and installation support