Substation Expansion consulting

Project’s scope of work included: 
  • Adding a fourth transformer in order to maintain reliability and a fully redundant transformer arrangement.
  • Building a new transformer bay and associated distribution main, feeders, and bus tie breaker.
  • Installing the following 34.5 kV. equipment on the low side:
      • Main circuit breaker
      • Three (3) feeder breakers
      • Bus tie breaker (operated in the normally open position)