EDG, Inc. was retained by Client to provide design, project management and procurement services to modify their existing dry cement terminal.

Existing Dry Cement Terminal Upgrade – Modifications included addition of a new rail unloading pit and related material handling equipment to feed an existing storage silo.  Scope also includes the redesign of the existing truck loading system, which consists of repositioning of the existing truck loading spout, the addition of a second truck loading spout as well as the replacement of the existing truck scale with a new split sale design. Engineering disciplines include structural, mechanical and electrical & instrumentation.

Dry Cement Terminal design improvements by edg

Existing Dry Cement terminal upgrade design recommendations by edg

process engineering dry cement terminal edg

Click the links to find out more:   About EDG, Inc.  //  EDG, Inc. Projects  //  EDG, Inc. Industries We Serve  //  EDG, Inc. Services  //  EDG Unifying Principles

   Follow us on our social sites:  LinkedIn:  @EDG  //  Facebook:  @EDGInc   //  Twitter:  @EDGInc