Elk-Antelope Field Development

Client | Interoil // Location | Papua New Guinea

Greenfield onshore development of a 400 mmscfd gas/condensate field to produce condense and stabilize condensate for barging. Gas is re-injected at 4,000 psig back into the reservoir via 28 km of pipeline.

The scope of work included FEED; Alternative Analysis, development of BFDs, PFDs, P&IDs, Equipment Packages, Major Engineering FEED Deliverables, and Class Three Total Installed Cost Estimate.

Current phase of development is designed to expand from 400 mmscfd of gas to 1.4 bscfd with amine treating, gas dew point control, gas dehydration, 30,000-40,000 BPD of condensate stabilization capacity, feeding two world class LNG trains.