Deepwater Gas Field Development Project

Location | Southeast coast of India

KGD6 offshore Southeast Coast of India

High pressure gas gathering system from 18 wellheads in maximum 1,200 m water depth. Design and installation of a PLEM in 600 m water depth.

Scope of work included: Umbilical running along the field to control all the subsea operations from Control room onshore. Three (3) BSCFD gas is transported through three parallel 24 inch transmission lines from a shallow water hub in 100 m water depth to a gas treatment plant onshore. Scope also included design of a finger type slug catcher. 


< View All Projects

< View Pipeline Engineering